Sunday, April 1, 2012

Going South Again (25-30 March)

Randonneurs and Walkers
So, Sunday 25th March, and we are finally off.  Intriguingly (“c’est marron” say the French) today there is a major fundraising walk from the Centre Socio-Culturel exactly where the boat is moored.  The first walkers started at 07.00 and we passed a good few with the dogs’ early morning walk.  Now as we go out along the main canal many are coming back.  Its is now 11.00 and we reflect, were we now still in England we would be joining the Malmesbury Walkers for the Sunday ramble.  We are thinking of you guys, and hope you have the same lovely weather as here:

Sunday Morning Walkers (Randonneurs) on the Canal Lateral

 Was This the Problem?
We cross over the Pont Canal and the Loire.  No problems now.  And 3 or 4 kilometres on we see a lonely digger along some rough but also newly cemented canal bank.  So this was the problem which held us up for three weeks.  It all seems so much nothing now.  But at least the canal is functioning for everyone before Easter.

New Concrete on the Lateral

On the way – and Slowing Down
Even though we were kicking our heels in Briare it is interesting that the body and brain still kept functioning at normal pace.  We thought we were resting, but somehow not.  But here as we wend our way through Chatillon (sur-Loire of course) and onward to the first night’s stop at Léré and then drift onwards on the Monday towards Herry, we actually feel that the world is really slowing.  These are well worn waters, and we are not going slow, but we feel we are cruising slowly.  At Herry we can rest with the boat open to the bank, and the girls (dogs) can wander freely, as long as they don’t disturb the sole angler.  There is even a bench to sit, sunbathe and read.

Linda and the Girls at Herry – Oh! That Sun’s Too Strong

The Gateway to the South
Day 3 and we push on South to Guetin.  Here we leave the Sub-Division of Briare, and the Department of the Cher.  For us its giant double lock is always the gatehouse to the South.  On the way we note how Marseilles-les-Aubigny has been cleaned up and many of the rotten hulks removed (is this the bright side of metal shortage?).  But at Cours-les-Barres not a boat to be seen.  We pass one German-flagged boat which is actually cruising and another moored but preparing to cruise.  These are the only moving boats we have seen in three days.  We know the sail boat the Mandrella is ahead of us, and the lock-keepers say these are the only boats moving at the moment.

La Guérite a Guetin

 and In the Bowels of the Lock

No Boats at Decize or Anywhere
Day 4 and the great drag around Nevers to Decize.  But again the canal seems fresh and clean.  Even at Pont Carreau it seems pleasant and we cruise towards Plagny and the Nevers branch.  Our friendly lock-keeper at Fleury has no veg this time of year, but is chatty as he sees us through the last three locks.  We reach Decize at 5.00pm (a later day than usual), and before checking with the VNF office that the Roanne canal is open, we go to look at the port, expanded and re-opened last year.  The section for Le Boat hire company is full (no hire boats out yet) but the new port is nearly empty.  Where have all the boats gone?

Empty Port at Decize

There is Industry in These Here Parts
So the next day we head on South towards Digoin and the Canal de Roanne.  It will take two more days before we reach new waterways.  We pass by Desbre.  Last year some quite large cargo boats were here.  But the cement works is still in full production, and it is interesting to see some industry after all the countryside.  And the last lock of the day is Clos du May, reputedly where the “dernier poil” (last surviving soldier of the First World War) was the lock-keeper in the 20s-40s, according to the novel by Jean Anglade.

Cement Works at Besbre

The Loire and the Breeze as we Reach the Roanne
We pass the night at Beaulon, a nice spot well-beloved of Motorhome (RV) travellers.  They do provide free electricity.  We lunch the next day at Diou.  This is a beautiful well-organised village and one of our favourite stops.  It will be the last before we reach the Roanne.

Village next to the Quay at Diou

Just after Diou the canal almost touches the Loire, and the breeze off the Loire is quite strong.  Linda and the lock-keeper get quite windblown opening the lock gates for out final lock.  But it is gorgeous sunshine still.

The Loire from the Canal

Flags flying High

Opening the Gates is Quite Hard Work

Next Episode - A New Waterway - The Canal de Roanne

Will She / Won’t She / Will We Ever Go (19-24 March)

Of Maps and Wood, and DVDs and Pacos
So Monday morning of our third week arrives.  What shall we do?  We have brought some Video box sets including “Spiral” (in French with English sub-titles) which we tried to watch in 2008 but Glyn was always away for key episodes.  So we try to get the DVD working.  We can never get a TV signal in Briare but that shouldn’t stop the DVD player.  It should be simple, but try as we may we can’t succeed. 

Meanwhile Philippe called from the Folk Abeille last week and we arranged to pop over to visit them again to finalise some details of their visit to England.  And then Annie rings to say she has got the map we wanted from England. We arrange to pop into Annie’s on the way to Philippe and Marcelle.

At Annie’s we ask if she can recommend a TV repairer in the area, but she has a different idea.  She calls Paco – her man for all seasons mechanical – and says he can probably fix it.  We arrange to meet on the way back from Philippe and Marcelle.  They as always are so inviting, and ask he we found the cold at the weekend.  Philippe’s wood was excellent we say, and get another small supply.  It is time we bought our own.

Annie and Paco come back with us to the boat, but we can’t get the DVD working.  It may be the SCART!  (We did learn the French for SCART but didn’t write it down so of course we now can’t remember.)  We say we’ll try to talk to the technicians in Barcelona who know what to do, but they can’t help either.  We’’ have another go tomorrow.

Tuesday evening and we have had no luck so Annie and Paco arrive again.  Paco tries a new SCART but no luck.  And then he seems to try every button on every remote control in every contribution.  We don’t know what he does but – presto – there it is.  And he explains what we have to do.  Not the SCART after all.  What a hero.  We almost needed God’s help, but Paco scores first.  So now at least we can watch the DVDs.  Canalling is so “back to nature”!!

Shopping for Friends
The rest of the week we kick our heels again.  The weather is gorgeous again (just because we have a firewood supply), so we walk a lot, and keep thinking of some shopping to do while we’ve got the car.  We bump into Martine Renard and Gilles Dazin, and feel guilty about all the people we haven’t contacted.  But we only expected to be here a few days. 

All Go - Maybe
Wednesday, and we are getting various messages from different sources about whether the canal will open this weekend.  So we go back to VNF directly and our chief engineer has returned from his obviously wonderful weekend in Portsmouth (English pubs do win us friends).  He is discussing it with his colleague.  The leakage problem seems solved but the query now is how fast can they refill the canal.  Understandably it has to be done slowly.  They will start tomorrow. Maybe Friday or Saturday.  Definitely Sunday.

So we make our plans to depart.  We arrange with Richard – the joint harbour master with Bruno – to fill with diesel on Friday, and Glyn arranges to take the car to Migennes (our eventual destination this journey) on Saturday.  Richard is not so sure Sunday will be OK, and other boaters have various opinions.  We’ll stick with the Sunday plans and if we have to wait another day, so what?

Ils Manquent de L’Eau
Meanwhile one or two other problems emerge.  The Canal du Centre (which we need to get from the Lateral to the Saone) was closed early for shortage of water last year.  Now this year it is said it won’t open until April and will close in May.  We check it out.  In detail indeed it only opens from 29 March to 20 May and may not open again after that.  That’s OK for now, but how will we get back after the summer?  Well, we can always come back up the Burgundy and then down the Nivernais.  Ah! But the Nivernais has a problem. (We learn more about this later.)  Who-ee!  Will we have to go right back north to the Seine?  This is going to be an interesting summer.

A Farewell Meal
Friday comes and we fill up with diesel.  We also have a meal with Annie, Patrick, Nicole and Michelle.  It’s a nice “au revoir” meal especially as we will not see Patrick again until at earliest October.   We feel we are on our way.

A Really Good Cuppa and Trains which Follow Canals
Saturday morning and Glyn sets off just after 9am.  He gets to Migennes just before 11am and has a nice cup of tea with Simon and Roger, neither putting the world nor the canals to rights.  They are excellent with boats though.  And everything is arranged for May.  Simon kindly gives Glyn a lift to the station (this limp really helps, but he would have probably done it anyway as he was going that way). 

And then the four hours back to Briare by train.  This time however it is much more interesting.  Having done the Yonne and Seine by boat it is interesting how the train follows the rivers.  Nearly all the stops are mooring places from our last journey in the autumn – Joigny, Villeneuve, Sens, Pont-sur-Yonne, Montereau, St. Mammes, Moret!! And then Souppes and Montargis.

Hold on There
It’s been a nice journey back, and he gets back an hour earlier than Linda expected.  Alas, her new is not so good.  Richard popped in to say the canal will not after all be open tomorrow.  OK.  We’ll wait till Monday.

We walk the dogs in the evening and bump into Bruno (like Richard he’s not working today) who is helping another boater with her tender.  We explain the delay to Monday.  No, no, I think you can get away tomorrow he says.  Call round to my boat about 10am in the morning and we’ll see.

So the next morning with no expectations, after walking the dogs, Glyn is getting his bike ready to go round to Bruno’s.  A knock on the roof.  The man himself.  You can go, he says.  The first lock is ready, and the canal is full.  Twenty minutes and we are away.  Do we believe it?  Not sure until we are over the Pont Canal, but then we are sailing, sailing. Hurrah!

Kicking Our Heels in the Sun (13-18 March)

What to do Next
Well now we are all ready to go but it is least this week before we know the canal will open.  We meet a few boaters, French, Belgian (Claude from the Garance) and Brits – Peter is tidying up the Elsie May while his wife is grandchild sitting in Australia.  Steve and Marie on the Eos, but will be popping back to Blighty after Easter before going out.   There is also the Mandrella, a small sail ship, in the Port du Commerce with three Brits who have been waiting a month to get through to the Med.  We chat to them while dog walking.  There are various rumours of what’s wrong and how long the canal will stay closed.

The Ever Helpful VNF Man
 We decide to go to the VNF (French Waterways) Sub-Division Office which is in Briare and get information direct from horse’s mouth.  The chief engineer is very friendly and helpful, invites us in and draws a diagram to explain the problem.  Water is leaking from the canal wall and they don’t know where it is going. A specialist inspection from Blois has just arrived to do some depth sounding.  However it may be building inside the bank, in which case they have a major problem.  If not it may require only a little work.  He suggests we telephone his colleague on Thursday (he himself is off to Portsmouth to see his son, and looking forward to visiting England) when it might be possible to get through at the weekend.

Heavenly Sunshine
Meanwhile the cold of last week has gone away, and temperatures are now reaching the mid 20s.  If we are stuck, it couldn’t really be a better place to be. Briare is a beautiful town.  We visit the art exhibition recommended by Philippe and Claude Albagli.  Well worth seeing.  The artist doesn’t seem to be able to get the perspective of the human body quite right, but his facial portraits are very good.  We walk a lot, especially along the Loire. 

Linda and the Girls walking the Loire in the Sunshine

The Pont Canal Stands Firm - Even If Not Crossable

Also just along from us two swans are nesting.  We have to walk the dogs past them every morning.  They are very protective and the cob can be quite vicious.  Topsy soon learns not to try to visit swans on the nest.

Swans on the Nest in the Early Morning

 Thank God for Kindles
We read a lot.  Linda has long been a slave to her Kindle, and Glyn got one recently.  But they are a boon when you have time on your hands to sit quietly.  Linda gets through a book every day or so, while even Glyn manages two in a week.  We also manage to inspect the Pont Canal.  Definitely no water.

The Pont Canal Drained of Water

E-mails, Maps, and French Connections
Back in January we ordered some additional canal maps, including some of this area.  Only one arrived before we left.  But as you can guess, now we are here we get a (helpful) email saying another has now been sent to home in England.  Then we remember that Annie (who-she? – well Annie-C’est-Moi of course) is going over to Malmesbury for the weekend with her grand-daughter to help set-up some work experience (Annie needs it).  She is staying with Tim and Maureen, so we call and ask could they can see if the map is in the house.  Will it work?  We do abuse our friendships.

An Unexpected Visitor
Thursday afternoon we have just rung the VNF to see how the works are going on the canal bank.  A very helpful young lady explains they are underway, but it will be at least until the 22nd (another week) until the canal can open – with the emphasis it seems on the “at least”.  Just as we are absorbing that there is knock on the roof of the boat.  A very smart lady asks if we are Glyn and Linda?  Yes?   Ah!  It’s Corine’s mum.  (Corine lives in Malmesbury now: Jeremy works for Dyson).  Her parents live at Chatillon(-sur-Loire). Agnes (Mum’s name) emphasises the sur-Loire, but then there a lot of Chatillons in France.   We have a cup of coffee and a long chat, and get invited over for Sunday cakes (Sunday tea as we would say in England).  That was a very pleasant surprise.

All change at the weekend
The weather dips at the weekend.  When Glyn takes the dogs out Saturday morning the roof of the boat is covered with frost.  The sun is strong, but even when he comes back a hour later the frost is still there on the unsunny side.

Sun and Frost in the Space of an Hour

 We visit Agnes and Jean-Loup on Sunday.  We are lucky because it is raining hard and haling outside.  It’s so nice to be inside chatting, and we even have a Skype/Webcam link-up with Jeremy and Corine, who’s just had another 21st birthday.   The cakes are gorgeous.  And we’ll never call Pain Perdu French toast, not when it comes with rum and vanilla in the mix.  While on the other side of the Loire we pop up to St Firmin to see the canal works.  Not much to see really – a digger and an empty canal. 

Well we’ve had a lovely week, and will have to see now how next week goes.






Friday, March 30, 2012

De-Winterizing (7-12 March 2012)

Ready for the Off
Well, here we are again.  All ready to go back to the canals.  Passage booked for 6-7 March.  This year we plan an early start, so that we get down the Canal Lateral de la Loire nice and early.  We confirm with Bruno, our Harbour Master at Briare, that we will arrive Wednesday 7 March.  But just as we are leaving Malmesbury a last short email from him.  A problem with the canal bank on the other side of the Loire means we cannot go south until at least 17 March.  Well, we are sure will fill the time.  All goes well with the crossing and the journey to Briare.  Once again (unlike the summer) the walk on Portsdown Hill before we take the ferry gives a fantastic view of Portsmouth and its night lights.

Water and Provisions
In Briare we quickly de-winterize the boat, re-connecting the water systems, and all goes absolutely well except a very small leak of water from hot water tank.  Is this the valve which was damaged by frost last year?  Luckily the wonderful Spencer and Victoria (Boatyard, Hilperton) made sure we had a spare just in case.  Even if have more to do, the dogs are already well settled by Wednesday evening.


The dogs clearly take pride of place on this boat - Day 1 and settled in


Thursday and Friday we spend re-provisioning (as our beloved American friends like to call it) including a new gas cylinder.  It rained Wednesday but the sky clears the next afternoon, and Thursday evening it starts to get a bit cold.  Luckily we have all the firewood which Philippe and Marcelle (Margot) gave us last year and wasn’t needed.  A beautiful log fire and we too are well settled in.  We are lucky as it hits -2ºC overnight

Thank God (or Philippe) for his Firewood


The Wonderful Folk Abeille
Friday evening we have been invited to Philippe and Marcelle’s also to meet up with Marie-Claude and Jacky to finalise some of the arrangements for the Folk Abeille visit to Malmesbury at the end of May.  Philippe asks if we have used the wood and would like some more.  We can’t refuse.  The wood stove is so much nicer heating than the radiator system.   We have an excellent meal and delightful evening, with some very funny thoughts about our mutual links.  As well as sorting out some fine points of detail.

Over the next week the Folk agree to do various turns to make the visit in May go tops.  They really are great.  And when we visit Philippe and Marcelle again to check on some final points we get another supply of wood.  We are (in danger of) abusing this friendship.  It is odd though.  The two times we have visited it has been very cold the few days before, followed in each case by a whole week of beautiful warm weather.

Quiet and Charming Weekend
We have a very relaxed weekend, a little shopping, lots of walks with the dogs, and lots of reading, with a little bit of contact with the outside to move on some projects.  On Monday a friendly mechanic from Charme Nautique (the local boat hire firm) pops in to check the hot water valve, which has been damaged.   He fits the new one and everything is functioning perfectly, so here we are already to go.

Sunday, March 18, 2012

Old Friends and Old Haunts (1-15 October 2011)

Saturday 1 October (Friends from England)
It’s a lovely day on Saturday morning.  Walking the dogs we chat to Greg and Cecilia on the Vrouwe Catharina.  They finally got away from Migennes, with no problems on the Seine, but are now steaming ahead to get to Briare, while we will take it very slowly. We order a taxi to the station to meet Pete and Jan from England, but the train times change and we have to re-book.  No problem and the taxi driver is very easy.  He gives a history of Montargis through new eyes, explaining it no longer has its old castle because the English destroyed it (a long long time ago).  Pete and Jan are with us for the next five days.  They have had a good time in Paris, but this is a very different sort of France.  They settle in and then we go out for another good meal, followed by an evening to relax and enjoy.
Sunday 2 October (Learning the Ropes)
Sunday and off we set on the final stage of the journey.  Pete helps with the mooring ropes, if only Topsy would get off them.  She thinks they are her day sleeping place, not for use for mooring.  At the first lock we discover that the lock-keeper will be with us for six locks.  A nice gentle journey.  We lunch at Montbouy, and then in the evening we discover Chatillon-Coligny.  Another town partly destroyed by the English. Oh dear! It is actually a quite beautiful old town.  One of the squares though seems totally taken over by semi-feral cats.  The dogs see this as a challenge.  Even on a Sunday the patisserie here is open until 7pm, so we order / buy some gorgeous cakes and then retire for a relaxing evening on board.
Monday 3 October (Gold Star for Chatillon)
Chatillon-Coligny boasts a pump-out.  On the way up a very nice lady at the port tourist office said we could use it but she would be shut from 1 October. But she gave us a number to call if we wanted to use it.  And true to her word two engineers from the town council come to help us pump-out.  And – a first since we’ve been in France – it works, although a little maintenance is required due to lack of use.  The guys who do the work are really excellent and insist (even in October) it’s all part of the service and no charge.  We decide we love Chatillon-Coligny, and we really do.  Hey guys in the big world out there, this is small town in France you ought to visit. Then we wind our way slowly down to Rogny, though overtaken by some impetuous Australians.  But we have a good friendly chinwag with them at lunchtime. Rogny is small but beautiful (though their mooring charges are somewhat excessive) and we discover for just a few miles we have re-entered Burgundy.   With Pete and Jan we take more time to examine the impressive staircase.  Not as big or long as Caen Hill, but much earlier and amazingly impressive for early 17th century engineering.
Tuesday 4 October (Ouzouer makes you Welcome)
We are really having a wonderfully slow and lazy time, though plenty of walking and chatting.  Today we will slouch down to Ouzouer-sur-Trezee.  Again there are six locks with one lock-keeper to work them all.  We go over the summit at Gazonne.  
The Summit at Gazonne - with Autumn Setting In

You can see now that summer is over but it is still beautiful and peaceful, even if it could be warmer.  Pete and Jan ought to come back in the summer sometime.  We are now trusted to work the locks all our own trusted with the locks all on our own as we descend to Ouzouer.  This is a light and friendly village, sparkling in the afternoon after-rain.  Sadly the cafe is closed for food (no food at the inn) but beer in the sunlight is very enjoyable and refreshing.  We sit quietly preparing our evening meal when along the bank come Michelle and Marie-Aimee. (Michelle who lives in Ouzouer is a good friend from twinning links, and Marie-Aimee her daughter has just moved to Nevers.) We have a great natter, and then part our ways for another lovely quiet evening
 Wednesday 5 October (Crepes, Churches, Canals and Aloyau)
The final short stage to Briare.  Again we are left in charge of the locks ourselves.  It only takes two hours.  When we arrive Bruno (our “Capitaine du Port” – neither harbour master nor marina manager seem a good translation) is always so good as he gives us a choice to moor on the left or right bank, and is perfectly understanding when we change our minds.  We go to the cafe right next to us to have delicious crepes and galettes for lunch, and then in the afternoon we all four stroll along the Loire before visiting the impressive St Stephen’s Church which amazingly we (Linda and Glyn) have never been inside before, but Jan and Pete say it might be worth a look, and it really is.  In the evening we walk the Pont Canal (well not Glyn of course) - the impressive Eiffel aqueduct over the Loire.  And then we have an excellent meal at the P’tit St Tropez, on Pete and Jan again.  Gosh eating out in France with Pete and Jan is exceedingly cheap (for us!).
A Great Evening at the P'tit St Trop

Thursday 6 October (Au Revoir and Bonjour)
Pete and Jan have to head back for Paris and home in England.  We decide they really do not need to get the 8:22. So have a little more time in the morning to make our goodbyes.  The dogs get a very good walk afterwards.  Glyn and Linda have to do some shopping afterwards. First to get petrol when we are accosted by someone who appears from nowhere and has bought an English car in the middle of France and needs our card to fill up as he only has cash!  But he doesn’t (want to) approach any French. Sadly we are very distrustful.  Afterwards we wonder whether we should have helped.  Who knows?  Then other shopping and we meet old friends Cecile (Roger) and Annie (Delbecq) in all sorts of places you don’t expect. 
Friday 7 October and onwards
It really is autumn now.  We need heating in the mornings.  We are very lucky to have meals with various friends in and around Briare and Gien.  The weekend is totally taken up.  On Tuesday we winterize the boat (all very easy except for empting the hot water cylinder which spills all over the engine room floor).  And then a drive to Dinard to spend a wonderful few days with Jean-Guy and Marie-Paule, great friends from the Brittany days, where we reminisce about old times and old friends, and eat amazingly well.  (Why eat out when your hosts cook like this?) 
This last fortnight has been fantastic.  But now it’s St Malo to Portsmouth, and winter at home.  We will miss France, but England is nice too.  See you again next year!!!

The Return to Sens and Montargis (24 - 30 September 2011)

Saturday 24 September (A Bad day for Fishermen)
We leave the boatyard at 8.40 with a little help from Mark, and head for the downstream lock, intending to make Villeneuve-s-Y today.  Simon says it’s only 15 mins to the lock so we don’t allow too much.  But it is slightly misty this morning so we will go slowly. Five-to-Nine and lock is in sight, but even before 9.00 the lock-keeper arrives and starts to open the gates, so very slowly we head into the lock lane.  This is a good start to the day.
Well, it was.  Around the bend from the lock moorings, out of sight, some idiot fisherman has four separate lines out not only in front of the lock, but stretching out right over the lock lanes into midstream before the weir.  As we see him Linda feels his invisible lines catch the front of the boat.  He screams “Arrete”.  What does he think we can do?  Already the boat is in as much reverse as possible, without pulling out into the weir stream.  Why didn’t you stop, he screams, as one of his lines snaps and flies back, which if it caught one of us in the face could have done serious damage.
Glyn screams back in his best French, what do you think you’re doing fishing over the lock lane right in front of the lock.  He recognises we are “Anglais” and comes out with a stream of abusive expletives about the English and why don’t we stay in England, some of which, unfortunately, we understand, and some, thankfully, we don’t.  He is very angry.  We sympathise that he has lost some lines, but what an idiot.  Stay in mid-channel, he says.  Does he think boats are going to head for the weir?  It’s all not worth arguing with him.  We finally release, disentangle or in one case cut his other lines.  He is still very angry and remonstrates with the lock-keeper who has begun to wonder why we are not entering the lock.  When the fisherman gets to him we can see he too is asking why he was fishing there.  We get into the lock, and the lock-keeper kindly makes the effort to walk over to us and apologise. 
Not a good start to the day, and we are both now agitated.  We always slow down and take care with fishermen, and we certainly don’t aim to antagonise the French. 
The next two locks pass without incident, and we travel past Joigny with its Saturday market looking beautiful as ever. 
In the third lock we check that the fourth remains open to 12.30.  Yes, confirms the lock-keeper.  He is young man, not looking very happy but also very contemplative.  It is a beautiful day.  Perhaps he wanted to be with his wife, girlfriend or partner.   As we leave the lock he announces that he is doing the next and so “Depechez-vous”, and then in English “Hurry up”.   We had been cruising gently at about 8kms up to now (and 6kms in the cut) but looking at the time and his sorry state we decide to oblige and cruise at 13kms (even though the river limit is 12kms).  We get to the next lock at just after 12 noon, and get out at about 12.20.  Unfortunately another boat is waiting to go up.  He could refuse it, but in fact he doesn’t.  Nice guy, just having an unhappy day.
Having raced that lock we have nowhere to moor for lunch, cannot possibly make the next lock by 12.30, and for 13.30 we will have we to go very slowly indeed.  So to the opposite extreme.  But this is actually very delightful.  The scenery is gorgeous.  The sun and warmth are beautiful.  And we toddle along at about 4kms.  It is marvellous, though sadly we are passing Villevaliers and were recommended a restaurant here.  The mooring is not good but it would have been worth it for the restaurant.  Unfortunately it was closed evenings on our way up, and now closed Saturday (or at least this Saturday) on our way down.  But it is a beautiful place as well.
We take the last lock for the day with a very bright-eyed equally young man as the eclusier, who couldn’t do anything more to please you, and chats about where we are going.  He is doing the lock after Villeneuve, but as we are staying the night he says I’ll see you in the morning.
We are mooring up at about 2.30pm.  Not a bad day, even with the first incident.  As we moor a couple of boats come racing out of the lock ahead and bounce our ropes.  One of Linda’s flies off just as she is pulling us in, and she goes flying backwards, knocking her head quite badly.   She has to lie down and clear the blood.  She says she is alright but it’s a nasty gash.  She insists on only cleaning it and resting.  Glyn sees her as well as possible, walks the dogs and does the essential shopping.  He finds a doctors but they say are closed and their notice only says “Dial 15” for an ambulance, and Linda wont’ want that.
We just sit to finally rest at about 4pm, with Linda still a little dazed, when there are loud bangs on the back of the boat.  It’s the local fishing club.  They are having a “concours de peche”, and they want more of the quay.  Can we reverse about 20 metres to make more space for them?  (We think, God, there are only 50 metres for boats and 400 metres without boats.  If it hadn’t been for the morning, we wouldn’t have thought that: it’s not an unreasonable request, but Linda is hardly fit to re-handle the ropes.  Very gently we do it, relying on the engine rather than towing.  Not our best day with fishermen.
By 7.30pm, and after eating a little, Linda says she feels a bit better, and wants to come for the dogs’ last walk.  We walk through the park, and then get to the High Street via the very beautiful Mairie.  The High Street has two gated arches at each end, with about 400 metres in between.  Every sort of shop you want and at least six ladies’ hairdressers.  But it is very attractively set out, with many older and as well as newer premises mixing well together, as well as functional. And just five minutes from the quay. We get to the back to the boat for another beautiful sunset.
Sunday 25 September (Sunny Summer Sunday Afternoon in the Parks)
Next morning we have arranged with the young lock-keeper to be there at 9am, and it is only 5 minutes.  The fishermen and women (in France a good third are women who enjoy this sport as much as the men) are all getting in place when the dogs are taken out at 7.30, and well established by 8.30.  We wish them good fishing and advise we are going to turn the boat.  Absolutely no problem, they say, but we also manage a perfect turn not disturbing their lines in any way.  The lock-keeper has it all open and prepared, and off we go.
Three locks and just 16 kms to Sens, which we take very gently and enjoy the beautiful countryside.  Although we are now approaching a more industrial and commercial stretch of the Yonne, we see only one such barge today.  We arrive in Sens at just after 12 noon, and have an easy mooring, again right in the Centre of town.  We have lunch and a rest, and discuss the rest of the day.  We decide the girls need some good walks.  When here previously the TI recommended two parks.  We tried one which was very good.  We decided to try the other this time.
So at 1.45 we set out.  It required a walk along the quay and then through various twisting back streets.  These gave an insight into Sens however, with its greatly varied mix of housing, though overall quite good.
The park was very different from that on the north side of town.  Probably larger, this was much more a botanical garden, but also with many walks and also lots of play spaces for children and youth.  Overall it was excellent, with only one marring aspect.  Dogs were not allowed off leads. Nevertheless we covered much of the park and it was a delight.   And we did find a quiet corner where we could go French and disobey the rules for 10 minutes.  We got back to the boat at 4pm, all four of us very hot and dog tired.  The park was full of families, and also couples of all ages.  It was very warm and sunny and it was great afternoon.  There was plenty of shade in the park, but not on streets going there and back.  But this park is a major asset to the city.
The Park in Sens - Dog Walking Not Allowed!

After a rest and read we also decided we take the dogs to the other park in the evening.  Less formally set out, but plenty of wild areas around a major lake where the dogs could just run free.  A perfect alternative to the botanical gardens.  We set off at 6.30 for this walk (a little cooler) but went via the main street which we had not fully seen before.  This is a fantastic pedestrianised area, with almost every shop you want.  We crossed the main square outside the cathedral, bustling with people and cafes, all enjoying the late summer evening.
When we reached the tree’d promenade which surrounds the town centre, which also adds much to its beauty, a full scale circus was in process.  It was busy then, but even busier when we returned at 8pm, with joyous families all pouring out. 
We were well tired, but this had been a glorious day in a wonderful city on a beautiful summer’s day, even if a little too hot, and technically in autumn.  The girls enjoyed their walks, and finally Topsy was learning not to pull.  But they wanted their beds when we got back.  Which we did too, after a good supper and some excellent grapefruit rosé.
Monday 26 September (Two Sides of Sens before the Leisure and Commercial Waterways)
Up early Monday morning before setting off on the more industrial waterway north to the Seine.  Glyn took the dogs for an early morning walk around the circular promenade.  What was sad even in this beautiful town was to see three homeless sleepers on park benches with all their belongings in plastic bags.  It brings you up sharp after the enjoyable day yesterday.  Linda headed to the market and the boulangerie, which gave just the other side of this bustling, prosperous city.
The journey north took us once again past Pont-sur-Yonne and the Deviation de Courlon (Courlon cut in English).  We expected to see more commercial boats north of Sens, working the quarries and silos, and we did meet a few, but it was surprisingly quiet overall. The one we did get locked with was our good old friend the Albatross again, but luckily he went ahead of us rather than hovering over our keel!
Oh! No! Not the Albatross

Mooring up at Mizy, which once more was our overnight stop before hitting the Seine, was again difficult.  This is sad as this is a beautiful area, and there are plenty of erstwhile moorings which have been allowed to decline.  But again we managed successfully to find a suitable haven, shaken only a little as two or three grain and gravel barges pass by.
It was great for walking the dogs, and as lovely quiet and warm evening.    
Tuesday 27 September (Bouncing with the Big Boys)
We set off promptly at 9am for the three locks and 14kms to reach the Seine.  The river was surprisingly quiet.  We kept our speed at 1400 revs (about 8 kms/hr) as we saw no need either to rush or burn fuel for the sake of it.  The locks with sloping sides were well mastered, with no problems now.
As we moved from the Yonne into the Seine we passed two boats making good speed at the junction, one entering the Yonne, and the other continuing up the Petite Seine.  It was interesting about how the different washes bounced us in slightly different directions, but only gently.
The 4 kms down to the lock at Varennes went very gently with no other boats in sights, until we reached the lock.  There an amazingly large tug and barge-pushing tug together almost filled this extremely wide and long lock all on their own.  Realising the mass which would come out towards us we steered into one of the side bays inside where the 1000 toners moor, waiting for the lock.
Weren’t we glad that did that!  The French tug and barge cruised out slowly and gracefully, with a salute from the captain and no distress to us at all.  But, just are we preparing to come into the main stream to enter the lock a 700 tonner from a nameless different nationality just came from nowhere racing past to take his priority place in the lock.  He did toss us.  But luckily we could just hold back in our haven while this road hog roared on.  We checked on the VHF with the lock master, who confirmed we could now enter.  We have to say the organisation and the communications at Varennes are absolutely perfect.  They looked after us and talked us through with great charm and care.
We let the road hog speed out of the lock and when he had gone we once again set off keeping to the right bank channel at a modest 8kms, aided by an additional 2kms from the flow of the river.  It was again quiet in this sometimes pretty, sometimes industrial and boring stretch of water. 
But not for long!  As we approached the EDF Montereau power station the number of boats sailing upstream began to increase.  And these were very big boys, again hitting the 1000 ton mark.  Coming upstream ourselves on a Sunday we had seen almost no boats.  Downstream on a working day we could now see how the Seine is used.   We lost count but estimated over 30 industrial barges passing us in just over an hour.  Their wash bounced us about a bit.  But keeping a reasonable distance this was quite manageable.  In just one case, where a 1000 tonner was no doubt pushing the 20kms speed limit, we had a lively sea-like motion, but overall it was a relatively easy passage with good experience, even if a little heavy on the tiller arm.
Boats Galore on the Seine

We had joked coming into the Seine 10 days earlier that it was difficult to realise that we had actually arrived in the main river.  Now we had to find the exit, and this was even more difficult.  Maybe the Loing river and canal are not regarded as a major waterway off the Seine, but it is a significant waterway and there were no markings whatsoever.  We didn’t miss it, but it took some looking out for.  
Where is the Loing?

And then there we were, once again in quieter waters, with the beautiful “Teresa” to welcome us home.
Ah! Not Only the Loing, but the Blessed - and as always colourful -Teresa!

There were two automatic upstream locks to get us onto the canal, both quite deep and we knew that getting mooring ropes from the bottom of the lock would not be easy.  The first had a lockkeeper, but unlike at Varennes it was more difficult to get signal to him that we needed assistance.  Only when a second boat arrived (the Garance, also based at Briare) and he had to re-open the gates, did he get out to take our ropes from deep in the lock.
The second lock was automatic and not manned.  The Garance came in behind us and started the automatic filling before there was any chance of our getting our rope on.  With no room for movement with the two boats in the lock, and with the water coming swirling in, this was not fun.  We avoided collisions but learned a lesson that in future we are never to be two boats in a lock without our mooring ropes on, even if it takes 10 minutes to get them attached.
 The rest of the journey should be simple.  Just two more locks before a gentle moor up for the night at Episy.  We did these with the Garance, who then continued onwards.  What surprised us was how many industrial barges were active at or moored at Episy.  In total we saw another seven that evening.  A very busy day.
So we naughtily opted for an evening meal out at the Cafe du Canal, all of just 60m away, across the lock. Only our second meal out (so far) on this trip, so we felt well deserved.  And we well rewarded.  It was a quite varied menu, and the food well presented.  A relaxing evening before the final walk with the girls, after a very full day.
Wednesday 28 September (All Quiet at Nemours)
A gentle rise the next morning, and a lovely stroll with the girls.  The late Indian summer continues, so we have beautifully warm and sunny weather. The journey today to Nargis (30 kms and 10 locks) may sound a lot but it is easy going.  We are travelling on our own now, with friendly, organised lock-keepers, who move us on with great efficiency.  The sun is shining.  The river approach to Nemours in the brilliant sunshine makes it look a lovely city.  We must make a longer visit here sometime.  But we have a distance to make today so carry on for lunch at Beaumoulin, which is a delightful where we can relax and the dogs can run.
In the afternoon we pass through Souppes, which is perhaps the end of the industrial part of the Loing, and attached to the Port of Paris.  By and large this as far as the big barges come, though some do go to Montargis.  But from now on we are in leisure boat country, except for the odd hotel barge.
We arrive at Nargis before 4pm, still in beautiful sunshine.  The dogs can run around as we moor up.  The only small downside here is that we have to moor to a sloping quay, so have to get our zigzag fenders under the boat to protect the bottom from the masonry and also to stop the boat sliding up into a steady list.  Fiddly, but it takes only 10 minutes. 
It is lovely evening at Nargis.  We walk into the village for some bread and one or two other essentials.  We enjoy the scenery to our own delight.  Topsy stays out on the green beyond the tow path, enjoying her freedom in the sun.  France is beautiful.
Thursday 29 September (Foret de Domaine de Châlette)
Today we will ease ourselves the final 10 kms of the Loing and just 5 kms of the Canal de Briare, to get ourselves back to Montargis.  It is easy locking.  We delay an hour between Cepoy and Châlette-sur-Loing to take the dogs for walk through the woods and do some weekly cleaning.  On the northward journey Châlette had just appeared to be the industrial edge of Montargis, but this spot shows it also has some beautiful countryside around it, and the woodland of the Foret Domaniale is well managed.  We are surprised how many are using it on a Thursday morning, including serious nature study from the local school.
And so we arrive in Montargis, again beautiful in the autumn sun.  The harbour master has to be contacted to find a mooring, which alas thus requires mooring twice, and a half-kilometre reverse which merely served to show our wonderful steering skills.
Although in the centre of town there are easy countryside walks along the canal which the dogs enjoy greatly.  They are certainly not going to demean themselves in the intriguing specially-provided “doggie garden” which looks more like a one-person prison exercise yard.  But we are surprised how many do use it.

Friday 30 September (Optimistic Police and Ravishing Dominicaines)
Today is a day just staying in Montargis.  We need to shop and clean the boat.  Tonight Cecile (who dances with the Folk Abeille with links with Linda’s Malmesbury Morris side) is joining us for a meal.  And tomorrow Pete and Jan are joining us from England for the gentle cruise down to Briare. 
First job after dog walking and breakfast is to get all dog hairs out of the carpets.  However before we start the local police arrive to collect our mooring fee.  The “town police” often do this in France, so it’s nothing wrong that we have done.
The local Bobbies are a very friendly pair and we quickly fall into discussing the Rugby World Cup.  They are convinced it will be a France-Australia final, and that France has every chance of winning.  We discuss the merits of the various teams, and finally they admit that Wales have possibly some chance (but not much).
Before finishing the cleaning and going shopping we chat to our Belgian neighbours, and get from then the advantages of mooring in Montargis.
Shopping in town is quite good.  There is no major supermarket in the town centre, but the small one that does exist is almost adequate.  Luckily fruit and vegetable shops and others make up for the weakness in the supermarket.
Before going off shopping Greg and Cecilia arrive in the Vrouwe Catharina.   We wondered if they had passed us as they were only a day behind us leaving Migennes and meant to be on a faster turnaround to get to the Briare.  They made the Seine with their reconditioned engine, and after an overnight here and some re-provisioning they will have a faster but gentle cruise down to Briare.
Cecile arrives for the evening.  She has a bit of a shocker of a cold, but makes light of it.  We go for a meal at “Les Dominicaines”.  We chose a “mystere” menu with courses chosen by the chef and accompanying wines by the sommelier.  We sit out in the open air and it is a beautifully warm evening.  The meal is very good indeed.  We discuss a thousand things.  Old friends, the way of life, the merits of Mr Hollande, Mme Aubry and Mr Sarkozy.  It’s odd, but possibly for understandable reasons we rarely discuss politics with French friends.
We go back to the boat for a coffee, and then part at midnight until next year, probably in England.  Tomorrow Cecile is off down to the Cher for a folk dancing festival.  We will wait in Montargis for the arrival of Pete and Jan.